- Start Up & Shut Down for PCV SP-55
Start-Up
- Check level of material in containers, making sure level is always over 1/3 filled for immersed units.
- Clean off applicator dispense head. Trigger applicator into waste container to verify smooth, air-free material flow.
- Place plastic nozzle on applicator. (if required)
Shut-Down
- Disconnect main air supply.
- Remove any disposable nozzle.
- Trigger the applicator to remove any pressure in lines or system.
- Clean and cover the head of applicator.