Industrial Systems Construction Equipment Request For Proposal Parts/Service Company Profile

Construction Equipment
Applications
Product Line
Materials
Dispense Valves
Photo Gallery
Video Menu
Cost Savings
Tech Support
Questions & Procedures
Associations
Home Page

PCV SP-55 Extra Information
Tech Data Sheet
Operation Instructions
Periodic Maintenance
Troubleshooting

Daily Operation - Start Up & Shut Down for PCV SP-55

Start-Up

  1. Check level of material in containers, making sure level is always over 1/3 filled for immersed units.
  2. Clean off applicator dispense head. Trigger applicator into waste container to verify smooth, air-free material flow.
  3. Place plastic nozzle on applicator. (if required)

Shut-Down

  1. Disconnect main air supply.
  2. Remove any disposable nozzle.
  3. Trigger the applicator to remove any pressure in lines or system.
  4. Clean and cover the head of applicator.