Industrial Systems Construction Equipment Request For Proposal Parts/Service Company Profile

Construction Equipment
Applications
Product Line
Materials
Dispense Valves
Photo Gallery
Video Menu
Cost Savings
Tech Support
Questions & Procedures
Associations
Home Page

GMP-500 Extra Information
Tech Data Sheet
Operation Instructions
Periodic Maintenance
Tips & Precautions
Troubleshooting

Daily Operation - Start Up & Shut Down for GMP-500

Start-Up

  1. Open "A" and "B" container supply valves under containers.
  2. Check level of materials in containers, making sure level is always over 1/3 filled. Use diverter plates (if tunnel down center of material occurs) if void in material develops.
  3. Clean off applicator dispense head with plastic mixer nozzle removed. Trigger applicator into waste container to verify smooth, air free flow of both materials. Wipe head clean and coat head with compatible lubricant.
  4. Place new plastic mixer nozzle on applicator block and secure with retainer nut.

Shut-Down

  1. Turn off motor controller or disconnect it from power.
  2. Remove plastic mixer nozzle.
  3. Trigger applicator to relieve any pressure in lines or system. Materials may ooze out of the applicator.
  4. For MANUAL System: Fill dispense head with compatible lubricant. One zerk is provided for each material component. Fill each zerk until the material inside the dispensing head is replaced with the compatible lubricant.
  5. Clean head of applicator and coat with compatible lubricant.